RAMONA EXPRESSWAY over INTERSTATE 215

08-RIV-215-R31.08 · County 065, California · Built 1984 · 5 Lanes · 11,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0730
Year Built
1984
Reconstructed
2013
Length
60.7 m (199.1 ft)
Max Span
31.7 m
Width
37 m (121.4 ft)
Lanes
5
Daily Traffic
11,700
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.