E NUEVO ROAD over PERRIS VALLEY STORM DRN

1.55 MI. E/O RTE. 215 FWY · County 065, California · Built 2021 · 6 Lanes · 16,020 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56C0652
Year Built
2021
Length
65.2 m (213.9 ft)
Max Span
32.2 m
Width
34.7 m (113.8 ft)
Lanes
6
Daily Traffic
16,020
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.