MURRIETA HOT SP RD over WARM SPRINGS CREEK

0.9 MI. E/O ROUTE 215 FWY · County 065, California · Built 1973 · 6 Lanes · 28,462 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
56C0229
Year Built
1973
Reconstructed
2010
Length
30.2 m (99.1 ft)
Max Span
11 m
Width
27.2 m (89.2 ft)
Lanes
6
Daily Traffic
28,462
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.