S215-S15 CONNECTOR over INTERSTATE 15
08-RIV-215-R8.94-MRTA · County 065, California · Built 1977 · 2 Lanes · 50,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.548764, -117.181561
This bridge is in worse condition than 68.1% of bridges in County 065. The average bridge in California is 0 years old; this one is 49 years old.
Nearby Bridges
MURRIETA HOT SP RD over INTERSTATE 215 & RAMPS
Built 1977
INTERSTATE 15 SB over YODER WASH
Built 1977
INTERSTATE 15 NB over YODER WASH
Built 1977
MURIETTA HOT SPR over INTERSTATE 15
Built 1977
JEFFERSON AVENUE over YODER WASH
Built 1996
JEFFERSON AVENUE over NORTH FORK YODER WASH
Built 1996
JACKSON AVENUE over WARM SPRING CREEK
Built 2016
INTERSTATE 15 NB over WARM SPRINGS CREEK
Built 1968
INTERSTATE 15 SB over WARM SPRINGS CREEK
Built 1951
MURRIETA HOT SP RD over WARM SPRINGS CREEK
Built 1973
Bridge Details
- Structure #
- 56 0702F
- Year Built
- 1977
- Length
- 162.8 m (534.1 ft)
- Max Span
- 59.7 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 50,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.