INTERSTATE 15 SB over YODER WASH
08-RIV-015-9.84-TMCA · County 065, California · Built 1977 · 3 Lanes · 125,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.554092, -117.190464
This bridge is in worse condition than 20.2% of bridges in County 065. The average bridge in California is 0 years old; this one is 49 years old.
Nearby Bridges
INTERSTATE 15 NB over YODER WASH
Built 1977
MURIETTA HOT SPR over INTERSTATE 15
Built 1977
JEFFERSON AVENUE over NORTH FORK YODER WASH
Built 1996
MURRIETA HOT SP RD over INTERSTATE 215 & RAMPS
Built 1977
JEFFERSON AVENUE over YODER WASH
Built 1996
S215-S15 CONNECTOR over INTERSTATE 15
Built 1977
LOS ALAMOS ROAD over INTERSTATE 15
Built 2015
GUAVA STREET over LINE D DRAINAGE FACILITY
Built 2014
GUAVA STREET over MURRIETA CREEK
Built 2018
INTERSTATE 15 SB over CALIFORNIA OAKS RD
Built 1979
Bridge Details
- Structure #
- 56 0703L
- Year Built
- 1977
- Length
- 25.3 m (83 ft)
- Max Span
- 24.7 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 3
- Daily Traffic
- 125,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.