LOS ALAMOS ROAD over INTERSTATE 15
08-RIV-015-10.03-TMCA · County 065, California · Built 2015 · 4 Lanes · 15,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.559533, -117.199917
This bridge is in worse condition than 20.2% of bridges in County 065. The average bridge in California is 0 years old; this one is 11 years old.
Nearby Bridges
MURIETTA HOT SPR over INTERSTATE 15
Built 1977
INTERSTATE 15 SB over CALIFORNIA OAKS RD
Built 1979
INTERSTATE 15 NB over CALIFORNIA OAKS RD
Built 1979
INTERSTATE 15 NB over YODER WASH
Built 1977
INTERSTATE 15 SB over YODER WASH
Built 1977
JEFFERSON AVENUE over DRAINAGE LINE F
Built 1997
ADAMS AVENUE over DRAINAGE LINE F
Built 1997
JEFFERSON AVENUE over NORTH FORK YODER WASH
Built 1996
JEFFERSON AVENUE over YODER WASH
Built 1996
WASHINGTON AVENUE over DRAINAGE LINE F
Built 1997
Bridge Details
- Structure #
- 56 0852
- Year Built
- 2015
- Length
- 89.9 m (294.9 ft)
- Max Span
- 45.4 m
- Width
- 27.4 m (89.9 ft)
- Lanes
- 4
- Daily Traffic
- 15,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.