DATE PALM DRIVE over UP RR & AMTRAK

0.2 MI. S/O RTE. I-10 FWY · County 065, California · Built 1966 · 5 Lanes · 24,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56C0073
Year Built
1966
Reconstructed
2006
Length
52.7 m (172.9 ft)
Max Span
19.8 m
Width
42.3 m (138.8 ft)
Lanes
5
Daily Traffic
24,000
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.