DINAH SHORE DRIVE over MISSION HILLS DR NORTH

1.5 MI W/ BOB HOPE DR. · County 065, California · Built 1988 · 4 Lanes · 19,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56C0573
Year Built
1988
Length
17.7 m (58.1 ft)
Max Span
16.8 m
Width
28.6 m (93.8 ft)
Lanes
4
Daily Traffic
19,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.