DATE PALM DRIVE over INTERSTATE 10

08-RIV-010-39.49 · County 065, California · Built 1966 · 8 Lanes · 10,560 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0560
Year Built
1966
Reconstructed
2014
Length
90.8 m (297.9 ft)
Max Span
31.8 m
Width
42.3 m (138.8 ft)
Lanes
8
Daily Traffic
10,560
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.