INTERSTATE 215 SB over MARTIN LUTHER KING BLVD

08-RIV-215-40.86-RIV · County 065, California · Built 2003 · 5 Lanes · 84,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
56 0803L
Year Built
2003
Length
39 m (128 ft)
Max Span
39 m
Width
26.3 m (86.3 ft)
Lanes
5
Daily Traffic
84,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.