INTERSTATE 215 over CHICAGO AVE

08-RIV-215-42.63-RIV · County 065, California · Built 1961 · 14 Lanes · 202,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0403
Year Built
1961
Reconstructed
2007
Length
97.5 m (319.9 ft)
Max Span
37.5 m
Width
67 m (219.8 ft)
Lanes
14
Daily Traffic
202,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.