INTERSTATE 215 over CANYON CREST DR

08-RIV-215-41.04-RIV · County 065, California · Built 1959 · 12 Lanes · 250,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0085
Year Built
1959
Reconstructed
2008
Length
33.5 m (109.9 ft)
Max Span
14 m
Width
65.3 m (214.2 ft)
Lanes
12
Daily Traffic
250,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.