COW CAMP ROAD over CHIQUITA CANYON CREEK
0.4 MI E/O ANTONIO PKWY · County 059, California · Built 2015 · 4 Lanes · 4,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.528831, -117.610586
This bridge is in worse condition than 21.9% of bridges in County 059. The average bridge in California is 0 years old; this one is 11 years old.
Nearby Bridges
ANTONIO PARKWAY over SAN JUAN CREEK
Built 1997
COW CAMP ROAD over GOBERNADORA CANYON
Built 2020
STATE ROUTE 74 WB over SAN JUAN CREEK
Built 2014
STATE ROUTE 74 over SAN JUAN CREEK
Built 1995
CHIQUITA CYN DR over PATRONES PKWY
Built 2018
LA NOVIA AVENUE over SAN JUAN CREEK CHANNEL
Built 1971
RANCHO VIEJO ROAD over HORNO CREEK CHANNEL
Built 1982
INTERSTATE 5 over EL HORNO STREET
Built 1958
INTERSTATE 5 over JUNIPERO SERRA RD
Built 1958
ROUTE 74 over ROUTE 5
Built 2018
Bridge Details
- Structure #
- 55C0693L
- Year Built
- 2015
- Length
- 432.8 m (1419.9 ft)
- Max Span
- 57.9 m
- Width
- 18.7 m (61.4 ft)
- Lanes
- 4
- Daily Traffic
- 4,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.