STATE ROUTE 74 over SAN JUAN CREEK
12-ORA-074-R2.28-SJCP · County 059, California · Built 1995 · 2 Lanes · 5,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.518953, -117.625622
This bridge is in worse condition than 21.9% of bridges in County 059. The average bridge in California is 0 years old; this one is 31 years old.
Nearby Bridges
STATE ROUTE 74 WB over SAN JUAN CREEK
Built 2014
ANTONIO PARKWAY over SAN JUAN CREEK
Built 1997
COW CAMP ROAD over CHIQUITA CANYON CREEK
Built 2015
LA NOVIA AVENUE over SAN JUAN CREEK CHANNEL
Built 1971
COW CAMP ROAD over GOBERNADORA CANYON
Built 2020
RANCHO VIEJO ROAD over HORNO CREEK CHANNEL
Built 1982
INTERSTATE 5 over EL HORNO STREET
Built 1958
ROUTE 74 over ROUTE 5
Built 2018
INTERSTATE 5 over EL HORNO CREEK
Built 1958
INTERSTATE 5 over JUNIPERO SERRA RD
Built 1958
Bridge Details
- Structure #
- 55 0850R
- Year Built
- 1995
- Length
- 82 m (269 ft)
- Max Span
- 39.6 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 5,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.