ROUTE 74 over ROUTE 5

12-ORA-074-0.01-SJCP · County 059, California · Built 2018 · 7 Lanes · 28,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 1104
Year Built
2018
Length
84.9 m (278.5 ft)
Max Span
45.8 m
Width
38.3 m (125.7 ft)
Lanes
7
Daily Traffic
28,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.