INTERSTATE 5 over SAN JUAN CREEK ROAD

12-ORA-005-8.80-SJCP · County 059, California · Built 1958 · 12 Lanes · 155,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 0298
Year Built
1958
Reconstructed
1996
Length
39.3 m (128.9 ft)
Max Span
19.8 m
Width
56.4 m (185 ft)
Lanes
12
Daily Traffic
155,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.