STONEHILL DRIVE over BNSF RY AMTRAK METROLINK

0.1 M/ W/O CAMINO CPSTRNO · County 059, California · Built 1992 · 4 Lanes · 30,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0608
Year Built
1992
Length
71.6 m (234.9 ft)
Max Span
25.9 m
Width
29.3 m (96.1 ft)
Lanes
4
Daily Traffic
30,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.