SILVERADO CNYN RD over SILVERADO CANYON CREEK

2.7 MI E/O SANTIAGO ROAD · County 059, California · Built 1971 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0180
Year Built
1971
Length
16.2 m (53.1 ft)
Max Span
7.3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.