SILVERADO CANYN RD over SILVERADO CANYON CREEK

4.4 MI. E/O SANTIAGO ROAD · County 059, California · Built 1947 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
55C0177
Year Built
1947
Length
12.8 m (42 ft)
Max Span
12.5 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.