SILVERADO CNYN RD. over SILVERADO CANYON CREEK

1.6 MI E/O SANTIAGO ROAD · County 059, California · Built 1935 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0174
Year Built
1935
Length
17.7 m (58.1 ft)
Max Span
17.7 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.