INTERSTATE 405 over LOS ALAMITOS CHANNEL

12-ORA-405-24.10-SLB · County 059, California · Built 1965 · 10 Lanes · 255,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
55 0441
Year Built
1965
Length
11 m (36.1 ft)
Max Span
3.7 m
Width
51.6 m (169.3 ft)
Lanes
10
Daily Traffic
255,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.