E22&S605-N405 CONN over SAN GABRIEL RIVER

07-LA-405-0.02-LBCH · County 037, California · Built 1966 · 2 Lanes · 40,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
53 1737H
Year Built
1966
Length
113.4 m (372 ft)
Max Span
23.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
40,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.