S405-N605 CONN over RTE 405 605 CONN RIV

12-ORA-405-24.11-SLB · County 059, California · Built 1966 · 2 Lanes · 22,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
55 0413F
Year Built
1966
Length
547.4 m (1795.9 ft)
Max Span
37.5 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
22,800
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.