BAKER - N15 ONRAMP over INTERSTATE 15

08-SBD-015-R138.46 · County 071, California · Built 1965 · 2 Lanes · 6,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0611S
Year Built
1965
Length
76 m (249.3 ft)
Max Span
25.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
6,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.