INTERSTATE 15 NB over PANO DITCH

08-SBD-015-R138.73 · County 071, California · Built 1965 · 2 Lanes · 22,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0281R
Year Built
1965
Length
12.6 m (41.3 ft)
Max Span
12.2 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
22,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.