INTERSTATE 15 NB over BERRY DITCH

08-SBD-015-139.22 · County 071, California · Built 1961 · 3 Lanes · 22,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
54 0282R
Year Built
1961
Reconstructed
1969
Length
12.1 m (39.7 ft)
Max Span
5.8 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
22,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.