INTERSTATE 15 over BELL MOUNTAIN WASH

08-SBD-015-47.39 · County 071, California · Built 1958 · 8 Lanes · 65,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0499
Year Built
1958
Reconstructed
2004
Length
68.3 m (224.1 ft)
Max Span
15.2 m
Width
50.8 m (166.7 ft)
Lanes
8
Daily Traffic
65,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.