N15 CONN FROM SR18 over BNSF RY UP RR AMTRAK ETC

08-SBD-015-43.48-VCTV · County 071, California · Built 2020 · 2 Lanes · 1,001 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0484G
Year Built
2020
Length
115.8 m (379.9 ft)
Max Span
32.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
1,001
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.