INTERSTATE 15 over POWER LINE WASH

08-SBD-015-52.34 · County 071, California · Built 1958 · 6 Lanes · 64,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
54 0572
Year Built
1958
Reconstructed
2005
Length
8.5 m (27.9 ft)
Max Span
2.7 m
Lanes
6
Daily Traffic
64,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.