MARENGO AVE over UPRR
50FT S/O MISSION RD · County 037, California · Built 1979 · 3 Lanes · 14,009 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.081386, -118.141928
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 47 years old.
Nearby Bridges
MARGUERITA AVE over UPRR
Built 1979
ATLANTIC BLVD over UPRR
Built 1979
FREMONT AVE over UPRR
Built 1979
WB10-SB ATLANTIC over ATLANTIC BLVD
Built 1953
INTERSTATE 10 WB over ATLANTIC BLVD
Built 1953
SIXTH ST over UPRR
Built 1979
EB10-NB ATLANTIC over ATLANTIC BLVD
Built 1953
INTERSTATE 10 EB over ATLANTIC BLVD
Built 1953
FOURTH ST over UPRR
Built 1979
INTERSTATE 10 WB over SIXTH STREET
Built 1953
Bridge Details
- Structure #
- 53C1664
- Year Built
- 1979
- Length
- 22.1 m (72.5 ft)
- Max Span
- 19.2 m
- Width
- 18.8 m (61.7 ft)
- Lanes
- 3
- Daily Traffic
- 14,009
- Material
- Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.