FREMONT AVE over UPRR

50FT S/O MISSION RD · County 037, California · Built 1979 · 5 Lanes · 51,262 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
53C1674
Year Built
1979
Length
16.2 m (53.1 ft)
Max Span
14.6 m
Width
25.6 m (84 ft)
Lanes
5
Daily Traffic
51,262
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$414,000
Total Project Cost
$696,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.