SIXTH ST over UPRR

50FT S/O MISSION RD · County 037, California · Built 1979 · 3 Lanes · 8,778 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

34.086758, -118.129497

This bridge is in worse condition than 64.9% of bridges in County 037. The average bridge in California is 0 years old; this one is 47 years old.

Nearby Bridges

Bridge Details

Structure #
53C1667
Year Built
1979
Length
16.5 m (54.1 ft)
Max Span
14.6 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
8,778
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.