LOWER AZUSA RD over SAN GABRIEL RIV

0.3MI W/O IS 605 · County 037, California · Built 1960 · 4 Lanes · 27,071 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C0436
Year Built
1960
Reconstructed
1975
Length
171.6 m (563 ft)
Max Span
12.5 m
Width
19.6 m (64.3 ft)
Lanes
4
Daily Traffic
27,071
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.