INTERSTATE 605 SB over SAN GABRIEL RIVER

07-LA-605-22.68-IRW · County 037, California · Built 1970 · 4 Lanes · 81,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2032L
Year Built
1970
Length
362.7 m (1190 ft)
Max Span
30.5 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
81,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.