LIVE OAK AVE over SAN GABRIEL RIV

0.3MI E/O I-605 FWY · County 037, California · Built 1961 · 4 Lanes · 25,359 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53C0446
Year Built
1961
Reconstructed
1973
Length
124.7 m (409.1 ft)
Max Span
13.1 m
Width
25.4 m (83.3 ft)
Lanes
4
Daily Traffic
25,359
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,167,000
Total Project Cost
$5,320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.