VALLEY BLVD over RUBIO WASH
0.5MI W/O ROSEMEAD BLVD · County 037, California · Built 1926 · 4 Lanes · 27,122 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
34.080436, -118.083361
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 100 years old.
Nearby Bridges
WALNUT GROVE AVE over RUBIO WASH
Built 1963
WELLS RD over RUBIO WASH
Built 1939
MARSHALL ST over RUBIO WASH
Built 1953
INTERSTATE 10 WB over WALNUT GROVE AVE
Built 1953
INTERSTATE 10 EB over WALNUT GROVE AVE
Built 1953
INTERSTATE 10 WB over SAN GABRIEL BLVD
Built 1953
MISSION DR over RUBIO WASH
Built 1927
INTERSTATE 10 WB over RUBIO WASH
Built 1953
INTERSTATE 10 EB over SAN GABRIEL BLVD
Built 1953
W10-SAN GABRIEL BL over SAN GABRIEL BLVD
Built 1953
Bridge Details
- Structure #
- 53C0346
- Year Built
- 1926
- Reconstructed
- 1954
- Length
- 12.8 m (42 ft)
- Max Span
- 12.2 m
- Width
- 27.3 m (89.6 ft)
- Lanes
- 4
- Daily Traffic
- 27,122
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $349,000
- Total Project Cost
- $586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.