MISSION DR over RUBIO WASH

1.0MI W/O ROSEMEAD BLVD · County 037, California · Built 1927 · 4 Lanes · 16,380 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
53C0584
Year Built
1927
Reconstructed
1974
Length
17.1 m (56.1 ft)
Max Span
16.2 m
Width
30 m (98.4 ft)
Lanes
4
Daily Traffic
16,380
Material
Concrete
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.