INTERSTATE 10 EB over SAN GABRIEL BLVD

07-LA-010-25.84-RSMD · County 037, California · Built 1953 · 6 Lanes · 104,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 0654R
Year Built
1953
Reconstructed
1972
Length
24.4 m (80.1 ft)
Max Span
24.1 m
Width
24.7 m (81 ft)
Lanes
6
Daily Traffic
104,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.