STATE ROUTE 39 over SAN GABRIEL CANYON

07-LA-039-21.67 · County 037, California · Built 2016 · 2 Lanes · 850 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 3096R
Year Built
2016
Length
20.4 m (66.9 ft)
Max Span
4.6 m
Width
4.6 m (15.1 ft)
Lanes
2
Daily Traffic
850
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.