RTE 39 over W FORK SAN GABRIEL RIVER

07-LA-039-24.10 · County 037, California · Built 1996 · 3 Lanes · 1,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2826
Year Built
1996
Length
35.7 m (117.1 ft)
Max Span
18.7 m
Width
11.4 m (37.4 ft)
Lanes
3
Daily Traffic
1,550
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.