STATE ROUTE 39 over W FORK SAN GABRIEL RIVER

07-LA-039-26.96 · County 037, California · Built 1962 · 2 Lanes · 1,618 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 0342
Year Built
1962
Reconstructed
1968
Length
85.4 m (280.2 ft)
Max Span
33.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,618
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.