SR 1 over BIG SYCAMORE CREEK
07-VEN-001-4.54 · County 111, California · Built 1938 · 2 Lanes · 11,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
34.071072, -119.014908
This bridge is in worse condition than 97.6% of bridges in County 111. The average bridge in California is 0 years old; this one is 88 years old.
Nearby Bridges
SR 1 over LITTLE SYCAMORE CREEK
Built 1928
MLHLLND HWY S/XING over ARROYO SEQUIT
Built 1938
SR 1 NB over CALLEGUAS CREEK
Built 1957
SR 1 SB over CALLEGUAS CREEK
Built 1934
STATE ROUTE 1 over REVOLON CHANNEL
Built 1985
STATE ROUTE 1 over REVOLON CHANNEL
Built 1985
STATE ROUTE 1 over ARROYO SEQUIT
Built 1927
LAS POSAS RD over STATE ROUTE 1
Built 1962
LAS POSAS ROAD over DISTRICT #2 CANAL
Built 1948
LAGUNA ROAD over MUGU LAGOON
Built 1949
Bridge Details
- Structure #
- 52 0011
- Year Built
- 1938
- Length
- 20.4 m (66.9 ft)
- Max Span
- 18.3 m
- Width
- 22 m (72.2 ft)
- Lanes
- 2
- Daily Traffic
- 11,600
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,035,000
- Total Project Cost
- $1,738,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.