STATE ROUTE 1 over REVOLON CHANNEL
07-VEN-001-10.00 · County 111, California · Built 1985 · 2 Lanes · 4,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
34.113522, -119.082861
This bridge is in worse condition than 71.9% of bridges in County 111. The average bridge in California is 0 years old; this one is 41 years old.
Nearby Bridges
STATE ROUTE 1 over REVOLON CHANNEL
Built 1985
SR 1 SB over CALLEGUAS CREEK
Built 1934
SR 1 NB over CALLEGUAS CREEK
Built 1957
LAS POSAS RD over STATE ROUTE 1
Built 1962
LAS POSAS ROAD over DISTRICT #2 CANAL
Built 1948
MAIN ROAD over DISTRICT #2 CANAL
Built 1948
LAS POSAS RD over REVOLON SLOUGH
Built 1962
LAGUNA ROAD over MUGU LAGOON
Built 1949
LAGUNA ROAD over MUGU LAGOON
Built 1949
WOOD ROAD over STATE ROUTE 1
Built 1957
Bridge Details
- Structure #
- 52 0421L
- Year Built
- 1985
- Length
- 56.1 m (184.1 ft)
- Max Span
- 18.3 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 4,300
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.