LAS POSAS ROAD over DISTRICT #2 CANAL
NBVC POINT MUGU · County 111, California · Built 1948 · 4 Lanes · 200 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
34.112961, -119.092289
This bridge is in worse condition than 97.6% of bridges in County 111. The average bridge in California is 0 years old; this one is 78 years old.
Nearby Bridges
MAIN ROAD over DISTRICT #2 CANAL
Built 1948
LAS POSAS RD over STATE ROUTE 1
Built 1962
STATE ROUTE 1 over REVOLON CHANNEL
Built 1985
STATE ROUTE 1 over REVOLON CHANNEL
Built 1985
SR 1 SB over CALLEGUAS CREEK
Built 1934
SR 1 NB over CALLEGUAS CREEK
Built 1957
LAGUNA ROAD over MUGU LAGOON
Built 1949
LAGUNA ROAD over MUGU LAGOON
Built 1949
WOOD ROAD over STATE ROUTE 1
Built 1957
LAS POSAS RD over REVOLON SLOUGH
Built 1962
Bridge Details
- Structure #
- 1CA0142
- Year Built
- 1948
- Reconstructed
- 1960
- Length
- 27.4 m (89.9 ft)
- Max Span
- 6.9 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 4
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $407,000
- Total Project Cost
- $446,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.