W GUTIERREZ STREET over MISSION CREEK
DE LA VINA ST /CHAPALA ST · County 083, California · Built 2019 · 2 Lanes · 4,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.414186, -119.695922
This bridge is in worse condition than 13.5% of bridges in County 083. The average bridge in California is 0 years old; this one is 7 years old.
Nearby Bridges
US HIGHWAY 101 NB over MISSION CREEK
Built 1990
US HIGHWAY 101 SB over MISSION CREEK
Built 1992
US HIGHWAY 101 NB over MISSION CREEK
Built 1992
US HIGHWAY 101 SB over MISSION CREEK
Built 1990
U.S. HIGHWAY 101 over CHAPALA ST EQUALIZER
Built 1992
MONTECITO ST over MISSION CREEK
Built 1915
DE LA VINA ST over MISSION CREEK
Built 2010
US HIGHWAY 101 NB over STATE STREET
Built 1990
US HIGHWAY 101 SB over STATE STREET
Built 1990
CHAPALA STREET over MISSION CREEK
Built 2013
Bridge Details
- Structure #
- 51C0374
- Year Built
- 2019
- Length
- 17 m (55.8 ft)
- Max Span
- 16.2 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.