US HIGHWAY 101 SB over MISSION CREEK

05-SB-101-13.96-SB · County 083, California · Built 1990 · 3 Lanes · 54,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51 0277L
Year Built
1990
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
54,500
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.