US HIGHWAY 101 SB over MISSION CREEK

05-SB-101-13.93-SB · County 083, California · Built 1992 · 3 Lanes · 54,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51 0298L
Year Built
1992
Length
13.4 m (44 ft)
Max Span
13.4 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
54,500
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.