SANDSPIT ROAD over GOLETA SLOUGH
AT GOLETA BEACH · County 083, California · Built 2017 · 2 Lanes · 8,786 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.417558, -119.831317
This bridge is in worse condition than 13.5% of bridges in County 083. The average bridge in California is 0 years old; this one is 9 years old.
Nearby Bridges
STATE ROUTE 217 over GOLETA SLOUGH
Built 1963
STATE ROUTE 217 over SAN JOSE CREEK
Built 1963
JAMES FOWLER ROAD over SAN PEDRO CREEK
Built 1980
MATTHEWS STREET over SAN PEDRO CREEK
Built 2005
HOLLISTER AVENUE over SAN PEDRO CREEK
Built 1995
PATTERSON AVENUE over ATASCADERO CREEK
Built 1967
FIRESTONE over CARNEROS CREEK
Built 1967
HOLLISTER AVE over CARNEROS CREEK
Built 1965
HOLLISTER AVE over SAN JOSE CREEK
Built 1964
STATE ROUTE 217 over HOLLISTER AVE
Built 1963
Bridge Details
- Structure #
- 51C0358
- Year Built
- 2017
- Length
- 51.2 m (168 ft)
- Max Span
- 29.4 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 2
- Daily Traffic
- 8,786
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.