STATE ROUTE 217 over SAN JOSE CREEK
05-SB-217-1.02-SB · County 083, California · Built 1963 · 4 Lanes · 12,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
34.424875, -119.826486
This bridge is in worse condition than 96.2% of bridges in County 083. The average bridge in California is 0 years old; this one is 63 years old.
Nearby Bridges
JAMES FOWLER ROAD over SAN PEDRO CREEK
Built 1980
MATTHEWS STREET over SAN PEDRO CREEK
Built 2005
SANDSPIT ROAD over GOLETA SLOUGH
Built 2017
STATE ROUTE 217 over GOLETA SLOUGH
Built 1963
HOLLISTER AVENUE over SAN PEDRO CREEK
Built 1995
HOLLISTER AVE over SAN JOSE CREEK
Built 1964
STATE ROUTE 217 over HOLLISTER AVE
Built 1963
PATTERSON AVENUE over ATASCADERO CREEK
Built 1967
FAIRVIEW AVE over UP RR & AMTRAK
Built 2000
FAIRVIEW AVE over U.S. HIGHWAY 101
Built 2001
Bridge Details
- Structure #
- 51 0217
- Year Built
- 1963
- Length
- 58.5 m (191.9 ft)
- Max Span
- 9.1 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 4
- Daily Traffic
- 12,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,682,000
- Total Project Cost
- $2,825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.