HOLLISTER AVE over SAN JOSE CREEK

0.1 MI EAST KELLOG AVE · County 083, California · Built 1964 · 4 Lanes · 25,445 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
51C0027
Year Built
1964
Length
13.4 m (44 ft)
Max Span
12.8 m
Width
32.1 m (105.3 ft)
Lanes
4
Daily Traffic
25,445
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.